Last EDF nuclear reactor back in action after safety check

The last of EDF Energy’s nuclear power reactors taken offline for safety checks in 2014 is now back in action, according to the energy firm. The second reactor of Heysham 1 power plant was switched back on at 6.40pm on Saturday after a “successful” inspection of its boiler. Regulators gave the last unit at Heysham 1 […]