Channel Tunnel interconnector will up capacity

The Channel Tunnel’s operator is planning a €250 million project to boost the capacity of the interconnector between France and the UK. The current link between the two countries, the IFA 2000, was installed in 1986 and its capacity has not been increased since then. Growing demand for electricity on both sides of the Channel […]