Poland secures loan for ‘first’ gas-fired plant

Poland (pictured) has secured a loan worth up to PLN 283 million (£58.3m) for the construction of the “first large scale” gas-fired power plant in the country. The combined cycle gas turbine (CCGT) plant in Stalowa Wola, located in the south east, will have a capacity of 449 MWe/240 MWt and replace the old coal-fired […]