mine
This mine will be built close to Moranbah and is projected to generate 2.5 million tonnes of coal during a five-year period
A solar farm with a battery energy storage system is predicted to lower carbon dioxide emissions
The project is forecast to save approximately 104,000 tonnes of carbon dioxide over a ten-year period